Associated Products
 Call 785-536-4412 to order your Automatic Water Salesman. Hours: 8am-5pm CST M-F

           

Introduction

Website Guide

Examples

Associated products

How to order

Questions (FAQ)

Technical support

Contact Vernon Mfg.

Distributors

 

Cross Connection Control Device

Attaches to the fill end of the supply hose. A 6" air gap prevents siphoning back into municipal water supply and cross contamination between tanks. 2" male pipe is standard. 3" and 4" sizes available. Aluminum.

Streetside Box


Typical mounting by customer
Control box is mounted in a 24" square, padlocking metal cabinet. The cabinet mounts on existing poles or to the side of a building close to the delivery area for easy access. Includes flush-mount components.

Prepaid Card System

 
Adds to any flush-mount system.  Customer receives a pre-paid card encoded with a dollar amount.  As water is purchased, money is deducted from the card.  When the card runs out of money, more can be added using the encoder.

 

PIN Operated System

 

Free standing pedestal.  Operates without money using customer number and PIN.  Customer pays according to a schedule set up by the city.  Printout to laptop or remote computer allows accurate accounting and billing.  Individual cut off for non-payment.  Features "TopKAT" by Gasboy.  Lead time: 4 to 6 weeks.

Key Operated System

Operates without money. Customer pays according to schedule set up by the city. Different key and totalizer for each user. Any number of keys in increments of 10. Individual cut off for non-payment. Features "Keytrol" by Gasboy.           Lead time: 4 to 6 weeks.

Swivel Joints

 

Style 30     

  Style 60

1 Plane     

 2 Planes

Rotation

Allows the fill pipe to swing in any direction to accommodate different size trucks and tanks. The two most popular styles shown. MFR: OPW.   Lead time: 3 to 4 weeks.

Backflow Preventers

Reduced pressure zone provides protection to potable water supply when required by local codes. Does not provide protection between tanks. Various designs and manufacturers.

Torsion Spring Loading Arms

Allows the fill pipe to rotate any direction.  A counterbalance maintains position while truck is loaded.  Swivel joints can be added to the end of the arm.   MFR: OPW.    Lead time: 4 to 8 weeks.